Phase V

Patio Construction (18 of 18)

HOME - Previous Page - Next Page

Day 667 - This is the middle of the putting green area with our two windmill palm trees.
Day 667 - The entire putting green is surrounded by our heart shaped garden area. Beyond the heart is the location of our water well which is approximately 35' deep.

Day 667 - Our mailbox took a good hit and built a small wall surrounding the mailbox.
Day 677 - Cabinets/Wet Bar is coming together. All the cabinets are made of cedar. Cabinets below are simply outside chemical storage. Hoping to make some home brews out here in the bar someday.

Day 677 - These cabinets are made to store glasses, etc.
Day 677 - The top deck is almost completed. This area will be used for corn hole.

Day 677 - Same part of the upper deck looking from the other direction.
Day 677 - Another view. This walkway is the outside entrance to the pool area.

Day 677 - This is the walkway up to the putting green from the inside entrance from the house.
Day 682 - This will look so much better with a putting green but the driveway currently has priority taken from the true authority.

Day 682 - These are windmill palms which are supposed to be cold hearty for our area.
Day 682 - Another view of the windmill palms.

Day 682 - Banana plant which is supposed to be cold hearty for this area. This one is potted and will spend it's time in the pool room during the winter.
Day 682 - We're also trying to plant this one and see if we can get it to live through the winter.

Day 682 - Cabinet doors are now attached to the wet bar.
Day 682 - There is a ton of storage below the bar for future party goers. We tiled the top at this point. When the bar top becomes too warn, I'm going to try to pour a concrete top. That would be perfect for an outside bar.

Day 682 - This is our new pond filter which works wonderfully. It was completely re-done looking for the leak. The entire pond water system coming from the pump dumps into this filter without any penetration of the pond liner. All of the plumbing runs down through the deck into the pump house below the pool house.
Day 686 - Two pround owners of a beautifully built backyard haven.

HOME - Previous Page - Next Page