Day 17 - We begin another day. Lana working on cleaning the Celtik wall and I'll begin digging.
Day 17 - In the back of this picture is our pond pump house which has flooded several times. With the renovation, we're going to move the pump house into the new pool house and place it under the shed as you'll see. This is in hopes to avoid any further damage to our pump. Little did we know, it wouldn't be the last of our problems.
Day 17 - After a lot of heated digging, we're bragging about the progress.
Day 17 -She needed to get a little taller.
Day 17 - Once again, here is our pond/patio area.
Day 19 - Now it's time to dig out the area for the pump house under the shed. Another HOT day.
Day 19 - This is a view from the existing pond pump house.
Day 19 - The pump house will be directly below the shed. Enough digging for the day.
Day 23- The pump house is built with treated lumber and i built it above the hole that was dug entirely prior to building it.
Day 23-A close-up shot of what needs to go down approximately 4 feet from where it is.

Day 23- I got one side down and it got stuck. It was VERY HOT once again and took a little time to determine how to get it in. It was a tight fit.

Day 23- Brute force is what it took, but it actually fit perfectly.

Day 23- Pondering for a few minutes to determine what is next. I guess it's time to pour a little cement.

Day 23- I poured approximately 3" of concrete floor to have a clean area to place all the pumping system.
Day 23 - This project is done for the day.
Day 23 - A well done hand dug hole for our existing plumbing to be re-routed.
Day 23 - The end of the day. Have a little lumber left over to continue working on that floor.
Day 28 - I sometimes need to step back and think about it for a while to figure out what to do next.
Day 28 - The first set of lines for the pond are in and the pond is running.
Day 28 - Have the entire floor complete and the pond pump house is behind the boards on the left.
Day 28 - Getting the back wall up first. It's the easiest and want to see how it goes.
Day 28 - After another successful day of work, time to relax in our new pool house.
Day 28 - With the inspection crew.
Day 28 - With the BOSS!!!
Day 28 - Tying down the corners.
Day 28 - Think I did it right?
Day 28 - A view from our new pool house
Day 29 - The walls keep coming along
Day 29 - Getting a bunch of supports to begin getting the poles ready.
Day 29 - Did I do that right?
Day 29 - It was easily in the 90's full-time so water breaks were a welcome event.
Day 29 - Almost completely done with the framing.
Day 29 - Construction zone. Gravel in back, boat in the way, all of the garage doors open and sawing away.
Day 29 - Lana's dug hole. She gave up after this one. I only had 15 more to dig.

HOME - Previous Page - Next Page